A mysterious 5-foot crack appeared in the ceiling of the quilt studio. It’s likely that someone working in the attic inadvertently stepped on it. A section of drywall had to be replaced, and this part of the ceiling will need to be re-painted.

Ceiling crack under repair.

Ceiling crack under repair.

 

In the laundry room, the base cabinet and countertop were installed. The space to the right of the cabinet will house a rolling laundry hamper.

Counter and sink in laundry room.

Counter and sink in laundry room.

 

Materials have arrived for the construction of the design wall in Lynda’s quilt studio. Two door panels will be combined to make a barn door that will slide back and forth on a track installed above the closet and bookcase below. The whole barn door will become the design wall.

Door panels that will become the desin wall.

Door panels that will become the design wall.

 

As more fixtures and supplies are delivered, they end up being stored wherever there is room. Today, I found a pair of toilets in the family room!

Toilets appeared in the family room.

Toilets appeared in the family room.