The past two days have seen lots of electrical work. Our breaker panel in the garage went from this:
To this:
The new circuits are all connected. All of the new outlets and switches are in place and working.
Plumbing fixtures are now installed in the master bath.
In the guest bathroom, the new vanity is in place but without its faucet. And the new light fixture has been installed. The room still needs to be painted.
In the laundry room, all of the wall cabinets are installed.